上石盘电航枢纽泄洪闸基础处理与消能防冲设计  被引量:2

Foundation Treatment and Design of Energy Dissipation and Scouring Prevention of Flood Sluice,Shangshipan Project

在线阅读下载全文

作  者:巩绪威 刘勇 华鹏飞 

机构地区:[1]上海勘测设计研究院有限公司,上海200434

出  处:《西北水电》2016年第4期38-43,共6页Northwest Hydropower

摘  要:上石盘电航枢纽工程坝址地质条件差、泄洪流量大、运行工况及水力学条件复杂,采用覆盖层大开挖岩基建闸结合消力戽消能的设计方案,较好地适应了闸址自然条件和枢纽的运用要求,节省了工程量和投资。经水力计算和模型试验验证,戽流消能在中、小洪水下泄时处在稳定水跃区运行,较大洪水下泄时对下游冲刷影响较小。As the weak geological condition at dam site,high flood discharge,complicated operating and hydro-mechanic conditions of Shangshipan project,the design featuring large overburden excavation,gate built on bedrock and bucket energy dissipator satisfies the natural conditions at gate site and requirements of the project operation as well as both work quantity and investment are reduced. Through hydraulic calculation and model test verification,the bucket flow energy dissipation can operate in the stable hydraulic jump area when both large and small floods are discharged. The larger flood discharged slightly scours the downstream.

关 键 词:砂卵砾石覆盖层 软岩地基 基础处理 闸室结构 戽流消能 水工模型试验 

分 类 号:TV22[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象