检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵春龙[1] 杜永[2] 南洪[1] 李岗[1] 郭天佑[1] 邹今春[1]
机构地区:[1]中国电建集团西北勘测设计研究院有限公司,西安710065 [2]青海黄河上游水电开发有限责任公司工程建设分公司,西宁810000
出 处:《西北水电》2016年第4期67-73,共7页Northwest Hydropower
摘 要:水利水电工程中双向门式启闭机各机构运行工况复杂,设计过程中需要考虑不同荷载组合下门机结构的的静、动力学及抗倾覆稳定特性。针对某水电工程坝顶双向门机,利用顺序荷载传递方法对小车架和门架结构进行了空间有限元分析,为设计提供了详细可靠的计算结果。The operating conditions of mechanisms of the two-way gantry hoist in of water resources and hydropower projects are complicated.During their design,characteristics of static dynamic mechanics and stability against turnover of the gantry hoist at different load cases shall be considered. Based on the design of the two-way gantry hoist at dam crest of one hydropower project,the trolley rack and the gantry structure are analyzed in term of finite element by application of sequence load transit method. This provides its design with detailed and reliable calculating results.
分 类 号:TV664[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63