上海庙矿区长城一矿“采、充、留”绿色开采技术研究  

Green Mining Technology with Backfilling and Retaining in Greatwall No.1 Mine in Shanghaimiao Coal Mine

在线阅读下载全文

作  者:赵大勇 张磊鑫 张苍 

机构地区:[1]山东能源新矿集团内蒙能源有限责任公司,内蒙古鄂尔多斯016200

出  处:《山西煤炭》2016年第1期69-71,共3页Shanxi Coal

摘  要:煤矿开采技术的进步和完善始终是采矿学科发展的主题,而绿色开采又是煤炭开采的发展方向,对提高煤炭采出率、保护生态环境和实现煤矿可持续发展具有十分重要的意义。上海庙矿区长城一矿将综合机械化采煤、地面洗矸与原生矸石架后充填、墩柱沿空留巷三种开采技术综合一体化应用,实现了由垮落法、有煤柱开采方式向充填法、无煤柱连续开采方式的转变,取得采煤工艺上的新突破,实现了集约高效、绿色开采。Development and improvement of mining technology are always the theme of mining development as a discipline. Green mining is the future direction of the coal mining, which is important to increase coal recovery rate, protect ecological environment, and realize sustainable development of mines. Greatwall No.1 mine in Shanghianiao coal mine integrates fully-mechanized mining, backfilling after support with washed gangue and primary coal rejects, and pier pillar gob-side entry retaining technology in order to transform from caving mining with pillars to continuous mining with backfilling without pillars. As a breakthrough in mining technique, the technology has achieved the intensive, efficient, and green mining.

关 键 词:“采、充、留”并行 钻孔溜矸 架后充填 墩柱留巷 

分 类 号:TD823.8[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象