检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天地科技股份有限公司开采设计事业部,北京100013 [2]中国煤炭科工集团有限公司,北京100013 [3]煤炭科学研究总院,开采研究分院,北京100013
出 处:《煤炭学报》2016年第8期1905-1911,共7页Journal of China Coal Society
基 金:国家自然科学基金资助项目(51304115,51504136,U1261211)
摘 要:以榆家梁煤矿44305工作面支架活柱伸缩量实测数据为基础,同时对比支架工作阻力监测数据,从工作面顶板下沉特征(周期下沉与循环下沉)及支架让压能力2方面研究了支架与顶板的动态相互作用。结果表明,割煤移架使得"支架-顶板"组成的稳定支撑系统失去平衡,造成移架后在形成新的稳定支撑系统前发生了顶板循环下沉与支架增阻;顶板循环下沉在其运动周期内累积形成周期下沉;44305工作面顶板周期下沉量200-300 mm,最大可达462 mm,下沉速度为40-60 mm/h,循环下沉量约30 mm,最大可达52 mm;支架活柱伸缩余量是评价支架让压能力的重要指标,44305工作面回采期间应控制最低采高,确保支架活柱伸缩余量在300 mm左右,避免长时间在较低支撑高度工作,减小切顶压架风险。Based on the measured data of support column expansion at No. 44305 working face in Yujialiang Coal Mine,and compared with the support resistance monitoring data,the paper studied the dynamic interaction between support and roof from the characteristics of roof sag( period sag and cycle sag) and yield ability to the pressure of support. The results showed that the coal cutting made a stable supporting system which formed by direct roof and support unbalanced,then after moving support,caused a roof circular sag and support resistance increase before a new stable supporting system formed. Roof period sag was accumulated by cycle sag in its movement period. The roof period sag at No. 44305 working face was 200-300 mm,maximum up to 462 mm; sinking speed was 40-60 mm / h,cycle sag was nearly about 30 mm,maximum up to 52 mm. The column expansion allowance was an important evaluation indicator to the yield ability to the pressure of support. The lowest mining height should be controlled in order to ensure the support column expansion allowance to be kept at 300 mm at least,avoiding long time lower support height working condition and reducing the risk of roof cutting.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15