检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]核反应堆系统设计技术重点实验室,四川成都610213
出 处:《管道技术与设备》2016年第2期1-4,共4页Pipeline Technique and Equipment
摘 要:在核电站管道系统中应用破前漏(LBB)技术后,对于满足LBB要求的管道系统,其管道发生破裂的概率极低,可以不用考虑其破裂效应,从而不必设计相应的防护措施。文中介绍了LBB技术及其应用要求,LBB技术分析流程,以及LBB技术中的关键技术—界值曲线的生成方法,并以某核电站项目非能动余热排出热交换器出口集管到蒸汽发生器之间的管道L113为例,对该管道进行了LBB分析评价。分析结果表明:该管道满足LBB要求,通过采用LBB技术,降低了设计、建造及维护的复杂性以及费用。After application of LBB to nuclear power plant piping, if LBB has been successfully applied for the piping sys- tem, piping has very low probabihty of rupture. Effects of the piping rupture can not be considered and the corresponding protec- tive measures don't have to be designed. LBB technology and request for its application and its analysis process and the method of producing bounding analysis curve which is key technology of LBB were introduced. In a nuclear power plant project, pipeline L113 between passive waste heat discharge heat exchanger outlet manifolds and vapor generator was taken as an example and LBB analysis of the piping L113 has been completed. The results indicate that LBB criteria are satisfied in the piping. By using LBB technology , the complexity and cost of the design, construction and operational are reduced.
分 类 号:TL3[核科学技术—核技术及应用] TH12[机械工程—机械设计及理论]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.10