机构地区:[1]中国石油天然气股份有限公司规划总院
出 处:《石油规划设计》2016年第5期1-5,54,共5页Petroleum Planning & Engineering
摘 要:截至2015年底,中国天然气长输管道里程超过7×104 km,LNG接收站已达到13座,陆路进口战略通道基本形成,LNG接收站陆续建成,国内骨干管网更加完善,储气库建设速度也在加快。2015年,中俄东线天然气管道中国段正式开工,东北进口通道进入实质性建设阶段;中国石化新粤浙管道工程获国家发改委核准;首个民营LNG接收站—舟山LNG获发改委核准。"十三五"期间,区域管网和支线管道将成为储运设施建设的重点;加快储气库等调峰设施建设迫在眉睫;"合资"成为天然气管道建设和运营的主流趋势。By the end of 2015, the total length of China's long-distance natural gas pipeline is over 70 000 kilometers approximately. Thirteen LNG terminals are built. Natural gas import gateways from pipeline are formed basically. LNG terminals will be built one after the other, the main natural gas pipeline network is formed better, and gas storage is built step by step. In 2015, the Chinese section of China-Russia eastern natural gas pipeline formally started, which indicated that the northeast import channel entered the stage of substantial construction; the XinY ueZ he pipeline project of Sinopec won approval of the national development and reform commission; the first private LNG receiving terminal, which is ZhouS han LNG terminal, won the national development and reform commission for approval. During the period of 'the thirteenth five-year plan', regional pipeline network and branch pipelines will become the focus of the construction of storage and transportation facilities; speeding up the construction of gas storage and other infrastructure projects is imminent; 'Joint venture' has become the mainstream in the construction and operation of gas pipeline.
分 类 号:TE8[石油与天然气工程—油气储运工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3