检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:邹祖银[1,2] 朱占元[1,2] 张锋[3] 陈婷婷[1,2] 张自兴[1,2]
机构地区:[1]四川农业大学土木工程学院,四川都江堰611830 [2]村镇建设防灾减灾四川省高等学校工程研究中心,四川都江堰611830 [3]哈尔滨工业大学交通科学与工程学院,黑龙江哈尔滨150090
出 处:《地震工程学报》2016年第4期541-548,共8页China Earthquake Engineering Journal
基 金:四川省教育厅科研创新团队项目(16TD0006);青年基金项目(15ZB0001);村镇建设防灾减灾四川省高等学校工程研究中心开放基金项目(CDPMV1405)
摘 要:基于饱和-非饱和渗流理论,综合考虑降雨入渗引起土体重量增加、渗透力增大以及抗剪强度降低等因素的影响,建立降雨条件下震后高边坡有限元模型,运用自编计算程序USLOPE-FEM进行稳定性分析。研究结果表明:未降雨之前,坡体塑性应变主要集中分布于松散堆积体下部与基岩分界面,边坡已经接近临界平衡状态;降雨量20mm/h时连续入渗使边坡上部土层含水量增加,负压区消失且出现饱和区;随着降雨时间延长,坡体表层暂态饱和区逐渐向内部推移,土体的重量和渗透力显著增大、抗剪强度明显降低,坡体中剪应力整体增大,塑性应变区向坡顶扩展而逐渐贯通;连续降雨6h后,临空面表层出现局部滑塌,连续降雨36h后整个堆积层将沿基岩滑塌逐步堵江。研究成果可为强降雨条件下边坡安全性评价提供参考,也为该边坡的失稳预警与滑坡防治积累资料。Continuous rainfall is an important factor inducing slope failure,and the causes of saturated-unsaturated slope failure under strong rainfall infiltration are diverse and complex.However,current research on the combined effects that induce slope failure is inadequate,particularly in relation to the increase in soil weight and softening of strength parameters after rainfall infiltration,both of which can impact slope stability.In this study,we establish a finite element model of a high slope following the Wenchuan earthquake in the condition of continuous rainfall.In the modeling process,the factors affecting slope stability caused by rainfall infiltration are considered,such as soil weight increase,penetration increase,and shear strength decrease.Furthermore,to analyze slop stability we employ a self-compiled calculation program,USLOPE-FEM,which is based on saturated-unsaturated seepage theory.Results show that the plastic strain zone of the slope is mainly distributed in the interface between the bottom of loosely accumulated materials and bedrock,and that the slope was close to a critical state of equilibrium before the rain.However,when the rainfall reached 20mm/h,continuous infiltration increased the soil water content in the upper slope,the area of negative pressure disappeared,and a zone of saturated zone appeared.With continuation of rainfall,the transient saturated zone on the slope surface gradually developed towards the interior,causing a dramatic increase of in the weight and penetration of the slope soil,together with an evident decrease in shear strength.Furthermore,an integral increase of shear stress in the slope occurred and the plastic strain zone extended and interpenetrated gradually to the top of slope.After six hours of continuous rain,a local slump appeared on the surface of the free face,and after 36 hours the whole accumulation horizon gradually slumped along the bedrock and block river.Based on results of calculations and the above analysis,it is recommended that the slope is firstly impr
关 键 词:边坡工程 强降雨 稳定性分析 饱和-非饱和渗流 汶川地震
分 类 号:P642.22[天文地球—工程地质学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3