重载铁路通道万t组合列车开行范围研究  被引量:3

Research on Operation Range of 10000-Ton Combined Train of Heavy Haul Channels

在线阅读下载全文

作  者:耿放[1] 罗玉屏[1] 

机构地区:[1]石家庄铁道大学交通运输学院,河北石家庄050043

出  处:《石家庄铁道大学学报(自然科学版)》2016年第3期53-58,共6页Journal of Shijiazhuang Tiedao University(Natural Science Edition)

摘  要:以方案主要可变动成本消耗临界值为目标,从乘务配置班数、日均运用货车辆数和机车供应台次3方面关键因素切入,以反应各起讫点间距离特征的机车走行时间为决策变量。对蒙西至华中地区煤运通道邓湖以北,开行5 000 t单元列车和开行1万t组合列车(单机牵引)两种开行方案进行了其对应的经济适用性分析比对,给出了两种方案各自对应的以起讫点间走行时间为自变量的成本函数,得出了运行图未满及相同运量条件下两种方案主要可变动成本支出相等时对应的临界点走行时间为18.285 h。为邓湖以北各OD对间万t列车的开行范围及时机提供了合理的理论依据。With the critical value in the main variable cost consumption of the schemes as the goal, starting with the key factors of three aspects including train crew number, average daily wagons and lo- comotives available, taking the travel time that represents the characteristics of the start-destination dis- tance as decision-making variable, an analysis and comparison is made of the economical applicability of the two kinds of operation scheme, the 5 000-ton heavy-haul train and the 10 000-ton combined heavy- haul train (single engine) in the north of DengHu of Coal Transportation Passage from West Inner Mongolia to Central China Area. The corresponding cost function of each scheme is presented with the travel time between the start and destination as independent variables. It is concluded that the critical travel time of the two schemes the train operation d oretical basis for the each OD pairs in the lagr with the equivalent main variable cost is 18. 285 hours under the condition that am is not fully filled and there is the same volume. It provides a reasonable the- operation scope and opportunity of the 10 000-ton combined heavy-haul train of north of DengHu.

关 键 词:重载运输 煤运通道 开行范围 开行成本 方案比选 

分 类 号:U296[交通运输工程—交通运输规划与管理]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象