丰满水电站施工期下游供水库水位控制  被引量:1

Reservoir water level control for guaranteeing downstream water supply of Fengman hydropower station in construction period

在线阅读下载全文

作  者:董延超[1] 石亮亮[1] 王强[1] 陈俊杰[1] 

机构地区:[1]中水东北勘测设计研究有限责任公司,吉林长春130021

出  处:《东北水利水电》2016年第9期9-12,71,共4页Water Resources & Hydropower of Northeast China

摘  要:丰满水电站全面治理(重建)工程施工期必须保证不间断地向下游供水,为保障下游供水安全,泄洪兼导流洞将作为非常时期保下游供水的备用通道。为满足施工期启用泄洪兼导流洞为下游供水,依据泄洪兼导流洞模型试验成果、供水和隧洞运行要求,并考虑水库冰冻期冰冻厚度影响,最终确定保下游供水水库控制水位,为施工期水库合理调度提供依据。The Fengman reservoir must ensure the uninterrupted downstream water supply in the construction period of Fengman hydropower station rebuild project. The discharge and diversion tunnel is taken as the standby convey for downstream water supply in construction period.Considering the model test results of flood discharge and diversion tunnel, the water supply and the tunnel operation requirements, and the influence of frozen thickness in freezing period, the control reservoir water level is determined for guaranteeing downstream water supply,which could provide basis for reasonable dispatching of reservoir in construction period.

关 键 词:施工期 启用泄洪兼导流洞 保下游供水 库水位控制 

分 类 号:TV61[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象