检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《武汉理工大学学报(信息与管理工程版)》2016年第4期401-404,414,共5页Journal of Wuhan University of Technology:Information & Management Engineering
基 金:水利部公益性行业科研专项基金项目(201301055)
摘 要:为了对工程安全管理进行全过程研究,完善工程施工安全风险管理决策过程中过度偏重预先控制的情况,基于FTA-BN组合模型,利用事先风险概率预测、事中关键因子识别和事后致因诊断的全方面管理方法,研究了工程施工安全风险事件的致险因子。最后,通过案例验证了模型的合理性与有效性,以期为工程施工安全管理决策提供依据,可在一定程度上减少安全事故的发生。In order to study the entire process of engineering safety management,improve the current construction safety risk management prevalent in pre-emphasis control in the decision-making process,based on the FTA-BN combination model,it use the all-aspect management methods,that composed by prior risk probability prediction,in-process key factor identification and ex-posed cause diagnosis.It studied on the risk factors in engineering construction safety risk events.Finally,the model is demonstrated to be scientific and effective through a case,hope to prove guidance for engineering construction safety management decision and reduce the occurrence of accidents to some extent.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15