检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]南昌市政公用投资控股有限责任公司,江西南昌330000 [2]同济大学地下建筑与工程系,上海200092
出 处:《隧道建设》2016年第9期1045-1051,共7页Tunnel Construction
基 金:国家自然科学基金项目(51378388&51208296&51478343);上海市科学技术委员会(13231200503&16DZ1200302&16DZ1201904);上海市教育发展基金会资助(13CG17)
摘 要:沉管隧道接头结构复杂,相对于预制管段,管段接头是沉管隧道的薄弱环节。管段的不均匀沉降会导致接头处的张开与错动,引起GINA止水带的变形,造成接头防水能力的降低甚至丧失,从而对隧道的安全运营造成极大的危害。采用有限单元法针对沉管接头GINA止水带进行建模,对多工况下GINA止水带的受力变形机制进行系统化研究,以期对沉管隧道接头的防水设计和施工提供参考。主要结论如下:1)运营工况下,GINA的压缩量不宜小于90 mm,接头张开量不宜大于35 mm;2)设计条件下管节相对水平错动20 mm,相对竖向错动35 mm时,不会影响GINA止水带功能;3)运营工况下,GINA止水带两肩部的差异变形对其止水功能影响较小。The joint structure of immersed tunnel is very complex; it is the weakness of immersed tunnel. The uneven settlement of the prefabricated segment would lead to the open and dislocation of segment joint, and would further affect the GINA water seal strip. The reducing and loose of the waterproofing capability of segment joint would lead to safety risk of tunnel running. The GINA water seal strip used in immersed tunnel is modeled by finite element method; and then the deformation mechanism of the GINA water seal strip under different construction conditions is studied. Some conclusions are drawn as follows : 1 ) The compression amount of GINA water seal strip should not be less than 90 mm and the opening amount of the segment joint structure should be less than 35 mm under operating condition. 2) The sealing function of the GINA water seal strip will not be affected under the conditions of the tangential dislocation of the joint structure less than 20 mm in horizontal direction and 35 mm in vertical direction. 3 ) The difference deformations of GINA water seal strip shoulders affect its sealing function little.
关 键 词:红谷隧道 沉管法 管段接头 GINA止水带 数值模拟
分 类 号:U45[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171