检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张雄天 Zhang Xiongtian(Lanzhou Non-Ferrous Colored Metallurgy Design Research Institute Co. , Ltd. Lanzhou 730000, Chin)
机构地区:[1]兰州有色冶金设计研究院有限公司,甘肃兰州730000
出 处:《金属矿山》2016年第9期78-82,共5页Metal Mine
摘 要:针对某金矿具有的缓倾斜、破碎、中厚矿体的特点,提出采用分段矿房法回采矿产资源;试验采场围岩总体稳定性较好,但矿体上盘边界是破碎蚀变带,岩石较破碎,而且矿区内地表水体较发育,上盘围岩中有含水层等特点。上盘围岩的冒落,对矿石贫化及安全采矿产生了很大影响,提出了预留上盘矿柱以减缓围岩冒落的方案。采用FLAC3D进行了回采过程中采场应力迁移、位移变化及单元破坏规律的数值计算研究。结果表明:预留2 m的矿柱有利于维持上盘的稳定性,防止塑性区域的扩大,从而达到降低矿石贫化及安全采矿的目的。For the characteristics of slowly-inclined,broken, medium thickness ore-body,the sublevel room-pillar mining method is put forwards to exploit the mineral resources. In the test stope, the surrounding rock has a better stability, but the hanging wall boundary of the ore body lies in broken alteration zone with broken rocks. The surface water in the mine is devel- oped well, and there is s aquifer layer at hanging wall of the surrounding rock. The caving of the surrounding rock produces a great impact on the ore dilution and the safety mining. The hanging pillars are reserved to slow down the surrounding rock ca- ving. The FLAC3D is used to make numerical analysis on the stope stress migration, displacement and the destruction rule per u- nit. The results showed that the reserved 2 m pillars are beneficial to maintain the stability of the hanging wall, control the ex- tending of plastic zone, so as to lower the ore dilution and achieve the safe mining.
关 键 词:缓倾斜破碎矿体 分段矿房法 预留矿柱 围岩稳定性
分 类 号:TD853[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7