作 者:刘军[1]
机构地区:[1]四川大唐国际甘孜水电开发有限公司,四川康定626001
出 处:《水力发电》2016年第10期9-11,共3页Water Power
摘 要:长河坝水电站大坝工程砾石土料分布范围广、土料性质均一性差。针对砾石土料的分布特点及其性状,在砾石土料施工复查期间进行了相关试验与分析,对土料质量和储量进行施工评价,并根据复查结果对下阶段的施工开采与试验提出指导性意见。The gravelly soil material used for the dam construction of Changheba Hydropower Station project is widely distributed in different yards and the uniformity of soil property is poor. In view of the distribution and nature property of gravelly soil material, the reviews on soil material before project construction are conducted and relevant tests and analyses are carried out to evaluate the quality and reserves of soil material. According to review results, some guidance suggestions for following excavation and tests of soil material are then presented.
分 类 号:TV221.2[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222