浙江路桥成桥状态及关键施工工序计算分析  被引量:3

Calculation Analysis of Finished Bridge State and the Key Construction Process of the Chekiang Road Bridge

在线阅读下载全文

作  者:王倩[1] 张春雷[1] 方亚非[1] 蔡春 

机构地区:[1]上海市政工程设计研究总院(集团)有限公司,上海200092 [2]上海市路政局,上海200023

出  处:《上海公路》2016年第3期20-23,90-91,共4页Shanghai Highways

摘  要:浙江路桥是一座鱼腹式铆接钢桁架结构的百年老桥,其位于上海市区苏州河上,属于上海市市级不可移动文物。为彻底修缮浙江路桥,将全桥整体移运至岸上维修厂房内大修,并于大修完成后移运回原位。采用有限元分析软件Midas对浙江路桥关键施工工序及成桥运营状态进行计算,同时指导施工过程及设计。计算结果显示各施工工况下结构安全,且成桥状态满足运营要求。本研究对于同类桥型维修加固施工及设计提供了参考借鉴。The Chekiang Road Bridge is a Fish-bellied riveted steel truss bridge,and already crossed the Suzhou River for one century cross in Shanghai..It is an important architectural and heritage of Shanghai.The rehabilitation process was finished in the temporary steel workshop on the bankside to make a thoroughly maintenance,then the bridge was shifted to its original position with the reverted procedure.The finite element software MIDAS was used to simulate the key rehabilitation processes and finished state of the Chekiang Road Bridge.The calculation results gives guidance to the construction and design.The results show that the structure of the bridge is safe during shifting and operation process,which can be referred for the rehabilitation of the similar projects.

关 键 词:浙江路桥 铆接钢桥 桥梁大修 修旧如旧 施工计算分析 

分 类 号:U445.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象