检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王啸
出 处:《工程建设与设计》2016年第10期19-23,26,共6页Construction & Design for Engineering
摘 要:体外预应力作为后张预应力体系的重要分支,其特点是将力筋布置在构件截面以外,因此,可以很方便的用于结构加固。作为一种主动加固法,体外预应力能同时大幅提高既有结构的承载力和刚度,在"拔柱"加固中具有传统方法无法比拟的优势,被越来越广泛地运用到实际工程中。论文对运用体外预应力进行"拔柱结构"加固的工作原理、设计方法、关键技术、规范要求等方面进行了探讨,可供类似工程参考。External pre-stressing technique is one of the most important branches of post-tensioned pre-stressed system. It is characterized with steel tendons fixed outside structure element, which make it conveniently utilized in strengthening existing buildings. As an act-in-advance technique, external pre-stressing can significantly promote the performance of structures in both bearing capacity and rigidity. With this incomparable strength in strengthening structures with columns removed, external pre-stressing technique has been used even more widely in real projects. This paper discussed the technique of using external pre- stressing in strengthening existing struc^tres with columns removed in the aspects of working principle, design method, key techniques, code requirements and etc. to provide reference to similarprojects.
关 键 词:体外预应力 结构加固 拔柱 结构承载力 结构刚度
分 类 号:TU757[建筑科学—建筑技术科学] TU378.4
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145