检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:高盛立
机构地区:[1]泰州市建设工程质量监督站,江苏泰州225300
出 处:《工程质量》2016年第9期9-12,共4页Construction Quality
摘 要:常见的民用单位工程,均应由一个承包单位完成,在单位工程内所谓的平行发包,就是事实上的肢解分包,这违反了建筑法和建筑企业资质管理规定。在单位工程内的平行发包,造成了合同管理的混乱,安全和质量责任无法落实。建设单位见证下的三方合同是解决平行发包的主要途径。Common units of civil engineering should be completed by one contractor of construction projects, the so-called parallel contract within the unit project was in fact the dismemberment of the subcontract, the violation of law and the regulations for the construction enterprise qualifications. Parallel out-contracting within the units led to confusion with the contract management, safety and quality responsibility cannot be implemented. The contract management of confusion was unable to implement the safety and quality responsibility. The construction unit under the witness of tripartite indenture was the main way to solve the parallel contract.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.147.140.129