检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西部钻探钻井工程技术研究院 [2]新疆油田公司勘探公司,新疆克拉玛依834000
出 处:《新疆石油天然气》2016年第3期76-79,5,共4页Xinjiang Oil & Gas
摘 要:针对玛湖凹陷西斜坡三叠系地层平均机械钻速低,钻井周期长问题,在分析已钻井地质环境和调研国内外提速提效新技术基础上,引进Tork Buster扭力冲击器+PDC钻井提速技术。现场试验五口井,平均机械钻速6.37 m/h,较邻井相同层段平均机械钻速提高143.13%;为进一步缩短钻井周期,在一口井上尝试使用Tork Buster扭力冲击器+PDC钻井组合钻套管附件取得成功。扭力冲击器提速工具在玛湖凹陷西斜坡三叠系地层提速效果明显,较好的解决了常规钻井机械钻速低的难题,节约了钻井周期,加快了增储上产步伐。In view of the western slope of Mahu Depression Triassic strata average low ROP,long drilling cycle,the analysis has been done on drilling geological environment and investigations and studies of domestic and foreign new technoloy of faster speed and higher efficiency,and the TorkBuster torque +PDC hammer drilling speed technology is introduced.The field test of five wells,the average penetration rate of 6.37m/h,compared with the same period of adjacent well layer average ROP increases by 143.13%;to further shorten the drilling cycle,in a well,tried using TorkBuster torque +PDC hammer drilling combined drilling and casing accessories,which is successful.Torsion impact apparatus speed tool sag in west slope of Triassic strata speed-up effect is obvious in Mahu,solves the problem of conventional drilling problem of low rate,so as to save drilling cycle,and speed up the pace of reserve.
分 类 号:TE921[石油与天然气工程—石油机械设备]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145