遮帘式板桩码头前轨道梁的优化设计探讨  

Optimum Design of Front Rail Bearer on Curtained Sheet Pile Wharf

在线阅读下载全文

作  者:赵雁飞[1] 张立国[1] 杨攀博 Zhao Yanfei Zhang Liguo Yang Panbo(CCCC First Harbor Consultants Co., Ltd., Tianjin 300222, Chin)

机构地区:[1]中交第一航务工程勘察设计院有限公司,天津300222

出  处:《港工技术》2016年第5期57-59,共3页Port Engineering Technology

摘  要:本文结合唐山港曹妃甸港区煤码头三期工程装船机轨道梁的设计过程,探讨码头轨道梁设计的创新方案。在遮帘桩导梁上设置支墩,通过缩短支墩间距减小前轨道梁断面和配筋,并改善配筋方式,取得了较好的经济效果,可为类似工程的设计提供借鉴。Based on Tangshan port Caofeidian harbor coal terminal phase-3 project, the design process of ship-loader's rail bearer has been researched to discuss an innovative design option of the rail bearer on wharf structure. Better economic effect is achieved by setting supporting piers on the leading girder of curtained sheet pile, reducing the distance between two piers that minimizes the section and reinforcement of the front rail bearer, and improving the way of reinforcement. The research results will provide a reference for similar projects.

关 键 词:遮帘式板桩码头 轨道梁 优化设计 

分 类 号:U656.112[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象