作 者:张景焘[1,2] 张豪强[1] 闫亚鹏[1,2] 左兴[1] 刘铎[1] 姚海星[1]
机构地区:[1]中交第一公路勘察设计研究院有限公司,西安市710075 [2]长安大学公路学院,西安市710064
出 处:《公路》2016年第10期229-236,共8页Highway
摘 要:在山区公路建设中,隧道工程的重要性越来越显著,其数量和长度明显增加,规模不断扩大。然而,不良的工程地质、水文地质以及人为因素引发的冒顶塌方是隧道施工过程中不可回避的技术难题。通过查阅国内外相关资料,总结前人关于隧道冒顶塌方治理措施和现场试验的方法进行风化泥岩隧道冒顶治理措施研究。提出了地表注浆加固、高压旋喷注浆加固隧道洞内淤泥、设置超前注浆小导管以及在隧道掌子面设置帷幕注浆等联合措施治理隧道冒顶,结果表明该措施合理可行。In the construction of mountain highway,the importance of the tunnel engineering is becoming more and more significant,the number and length of tunnel projects are obvious increasing,and the dimension is also constantly expanding.However,the roof fall in tunnel engineering arising from unfavorable engineering geology,hydrogeology and human factors is an unavoidable technological difficult problem in the process of tunnel construction.Through access to relevant literature from domestic and abroad,the previous method of tunnel roof fall management scheme are summarized and field investigation is conducted to study the treatment measures for the weathered mud stone tunnel roof fall.Combined measures are proposed to control the roof fall of tunnel such as taking surface grouting reinforcement and high pressure jet grouting reinforcement measures with the mud in the tunnel,setting small duct grouting and curtain grouting joint measures etc.The results show that the measures are reasonable and feasible.
分 类 号:U457.2[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222