检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:冯昆荣[1]
出 处:《科技通报》2016年第10期94-97,共4页Bulletin of Science and Technology
摘 要:利用现场实测和有限元仿真的方法研究了偏压高铁隧道施工后的位移应力变化。现场实测中,在每个断面布置7个测点,测量断面间距为10 m,获得了第一手的现场实测数据,在隧道施工过程中提供实时的监控依据。利用专业网格划分软件Hyper Mesh和大型通用有限元软件ABAQUS建立了偏压地形-隧道衬砌的高仿真有限元模型,对隧道开挖后的应力场和位移场进行了模拟。模拟结果显示,偏压隧道呈现位移场和应力场不对称分布的特点,总的来说,埋深较大的位置沉降大。有限元模拟结果与实测的结果吻合,能很好地为实际施工给出指导作用。Displacement and stress field of a high- speed rail tunnel with symmetrical loading were researched using site measurement and finite element method(FEM) simulation. Seven measurement points were set on every section and the distance between each two measurement section was 10 meters.Displacement monitoring supplied one-hand data to the construction process. A vivid FEM model were built and calculated via the Software of Hyper Mesh and ABAQUS, which contains lining of tunnel and terrain close to real geography. The result shows a symmetrical distribution of field of both stress and displacement exists because of the symmetrical loading, and generally speaking, a large depth of tunnel leads to a large settlement. The FEM result is coincide to the result of site survey.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15