高水头深孔事故闸门的原型动水闭门试验  被引量:1

Prototype Closing Test in Flowing Water for Deep Emergency Gate with High Water Head

在线阅读下载全文

作  者:陈洪伟[1] 姚宏超[2] 陈丽晔[2] 

机构地区:[1]黄河水利水电开发总公司,河南济源454681 [2]黄河勘测规划设计有限公司,河南郑州450003

出  处:《红水河》2016年第5期6-8,16,共4页Hongshui River

基  金:河南省交通运输厅科技项目(2012P51);河南省教育厅重点科技项目(14B580001)

摘  要:某工程孔板洞和排沙洞弧门设计水头分别达到140 m和122 m,高水头引起高压力、高流速,为了有效排沙,要求闸门频繁局部开启,由此给该工程弧门结构设计带来一系列研究课题。笔者结合该工程事故闸门的原型动水闭门试验情况及产生原因进行详细介绍、分析,对泄水建筑物的通气孔设施设计提出建议。The design water head is 140 m for the gate of orifice tunnel and 120 m for that of desilting tunnel of a project. High water head results in high pressure and high flow rate, and gates shall be often partially opened for effective desilting. Therefore, a number of issues shall be studied in structural design of the gate. This paper studies the prototype closing test in flowing water for emergency gates of the project and the causes, and provides suggestions for design of air holes of water release structures.

关 键 词:事故闸门 动水试验 原型试验 通气孔 

分 类 号:TV663.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象