观音岩水电站厂房混凝土复杂结构面连续上升模板技术  

Technology of Continuous Rising Formwork for Complex Concrete Structural Plane of Power House of Guanyinyan Hydropower Station

在线阅读下载全文

作  者:罗远耀 郑建林 

机构地区:[1]中国能源建设集团广西水电工程局有限公司,广西南宁530001

出  处:《红水河》2016年第5期26-29,共4页Hongshui River

摘  要:金沙江观音岩水电站4号、5号机组土建施工,因基础交面时间严重滞后,为了加快厂房主机间混凝土施工,采用了混凝土连续上升模板技术,巧妙躲开了复杂结构面不利因素,达到混凝土施工连续上升,抢回了之前滞后工期,得到业主和其他单位的一致好评。The civil work of 4# and 5# units of Guanyinyan Hydropower Station on the Jishajiang River is delayed greatly due to the delayed handover of foundation. In order to accelerate concrete engineering of generator hall of the power house, continuous rising concrete formwork is adopted to cope with complex structural plane and delayed construction, and praise from the Employer and other companies is gained as a result.

关 键 词:模板技术 厂房混凝土 观音岩水电站 

分 类 号:TV544.91[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象