Atay水电站二级坝左岸坝肩覆盖层帷幕灌浆设计  

Overburden Curtain Grouting Design for Left-Bank Abutment of The Second Stage Dam of Atay Hydropower Project

在线阅读下载全文

作  者:梁良 蒋永红 

机构地区:[1]中国能源建设集团广西电力设计研究院有限公司,广西南宁530007

出  处:《红水河》2016年第5期58-60,共3页Hongshui River

摘  要:Atay水电站二级坝左岸堆石坝段及上坝公路段覆盖层岩性为粉质黏土混碎石、块石,经综合分析覆盖层帷幕灌浆现场生产性试验成果,提出了防渗帷幕设计方案并付诸实施,经三年多时间的运行,证明覆盖层的防渗设计是成功的。The overburden layers of the rock-fill dam section on the left bank and of dam abutment of the second stage dam of Atay Hydropower Project consist of silty clay sandwiched with debris and rock block. According to the comprehensive analysis of the productive test results of site overburden curtain grouting, an impervious curtain design scheme is proposed and put into implementation. After operation of more than three years, the impervious design of overburden layer is proved to be successful.

关 键 词:Atay水电站 帷幕灌浆 坝肩 覆盖层 

分 类 号:TV543[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象