沪昆客专大断面隧道施工机械设备配套及作业模式  被引量:1

Mechanical Equipment Matching and Operation Mode of Large Section Tunnel Construction in Hukun Railway

在线阅读下载全文

作  者:席宏博 袁仁爱[1] 

机构地区:[1]中铁一局集团有限公司,西安710054

出  处:《价值工程》2016年第26期153-155,共3页Value Engineering

摘  要:结合中铁一局沪昆客专管段内隧道施工实践,以优化资源配置、提高大断面隧道施工效率为目的,研究确定大断面隧道施工机械设备配套原则。分别针对开挖、支护、防排水、衬砌等不同工序,形成了客运专线大断面隧道机械设备配套及作业模式,形成了客运专线大断面隧道机械化作业面,为客运专线大断面隧道施工提供了经验与借鉴。Combined with the tunnel construction practice of Hukun railway of China Railway First Group Corporation, and in order to optimize the allocation of resources, improve the efficiency of large section tunnel construction, this study determined the large section tunnel construction mechanical equipment matching principle. Respectively aiming at the excavation, support, waterproof and drainage and other different lining process, the large section tunnel mechanical equipment and operation mode formed in the passenger dedicated line, as well as the large section tunnel mechanization industry face, offering experience and reference for large section tunnel construction of passenger dedicated line.

关 键 词:大断面隧道 机械设备 配套 作业模式 

分 类 号:U455.4[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象