检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江勘测规划设计研究有限责任公司,湖北武汉430010 [2]国家大坝安全工程技术研究中心,湖北武汉430010
出 处:《人民长江》2016年第19期83-86,共4页Yangtze River
摘 要:部分河岸式溢洪道出口河道狭窄、曲折,岸坡陡峻,河床基础抗冲能力较差,采用挑流消能时挑射水流会砸落淘刷护坦、挑流鼻坎基础,危及下游岸坡稳定安全。为验证泄洪挑射水流形态及其对河床、岸坡的冲刷影响,以民乐河水库工程为例,通过水工模型试验进行分析并对挑流鼻坎体型进行优化。试验结果表明,溢洪道挑流鼻坎采用斜切坎配合折流器体型能有效改善挑射水流流态,对下游河床、岸坡的冲刷影响较小,可确保工程安全运行。The outlet channel of some river- bank spillways are characterized as narrow and zigzag with steep slopes and riverbed foundation of poor anti- scouring ability. When ski- jump energy dissipation is selected for this type of spillway,the ski-jump flow may hit and scour the apron and flip bucket foundation,which will endanger the downstream slope stability. In order to verify the deflecting flow hydraulic geometry and its scouring influence on riverbed and bank slope,the spillway of Minlehe Reservoir was taken as a case,hydraulic model test was carried out to optimize the shape of flip bucket. The test result shows that bevel- type flip bucket with deflector can improve the flow geometry and has little influence on downstream riverbed and slope,which will ensure the safety operation of the project.
分 类 号:TV651.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3