检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:周剑[1] 施凌[1] 唐敏[1] ZHOU Jian SHI Ling TANG Min(CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China)
机构地区:[1]中交水运规划设计院有限公司,北京100007
出 处:《水运工程》2016年第10期106-109,113,共5页Port & Waterway Engineering
摘 要:按照国内港口工程规范工程水位计算的要求,需要使用长短期实测水位资料。而海外工程项目实测数据匮乏,资料深度不满足工程水位的计算要求。以埃及苏赫纳项目为依托,对港口工程水位进行计算,阐明国内外港口工程水位计算方法的异同。According to the requirement on water level calculation stipulated in Chinese code for port engineering, the long-term & short-term real-measured water level are needed. Due to the lack of observation data for overseas projects, design water levels can not meet the requirements of Chinese Code. Based on Ain Sukhna project in Egypt, we calculate the water level of port engineering, and expound clearly the similarities and differences of calculation methods for the water level at home and abroad.
关 键 词:极值水位 大潮平均高潮位 增水 假潮 海平面上升
分 类 号:U652[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.176