检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王安华[1] 陈志乐[1] WANG An-hua CHEN Zhi-le(CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China)
机构地区:[1]中交水运规划设计院有限公司,北京100007
出 处:《水运工程》2016年第10期123-127,共5页Port & Waterway Engineering
摘 要:为满足宁波梅山港区滚装码头90%船舶全天侯作业要求,码头引桥面较低。由于工程区波浪较大,所以引桥设计的主控荷载由车辆荷载变为波浪荷载。为使引桥抵抗波浪的上托、下砸和侧推作用,设计采用双向受力预应力箱梁、横向刚度前弱后强的桩基排架和波浪荷载传力装置,实现了在低高程和大波浪条件下的桩基箱梁式引桥设计,各项指标均满足规范要求。总结其设计方法及经验。To meet the requirement of all-weather operation for 90% vessels in ro-ro wharf of Ningbo Meishan port, the elevation of wharf and approach jetty is low.Because of the large wave in the engineering area, the master load of the jetty turns to be the wave load instead of the vehicles load. To resist the uplifting, clown-falling and horizontal thrusting forces from the wave, the design adopts the bi-directional-loaded prestressed girder, the front- weak & back-strong pile bents and wave load transmitting device to realize the design of pile-girder type approach jetty with low top-elevation and large wave.All indices meet the requirement of the standards.The design method and experience are summarized.
关 键 词:滚装码头 桩基箱梁式引桥 波浪主控 前弱后强的桩基排架 双向受力预应力箱梁 波浪荷载传力装置
分 类 号:U65[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222