地下核电厂应急计划区最小化方面的初步研究  

Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant

在线阅读下载全文

作  者:吕焕文[1] 景福庭[1] 刘嘉嘉[1] 王军龙[1] 杨平[1] 张涛 

机构地区:[1]中国核动力研究设计院核反应堆系统设计重点实验室,成都610213 [2]长江勘测规划设计研究院,武汉430010

出  处:《核动力工程》2016年第5期152-155,共4页Nuclear Power Engineering

摘  要:选取具有包络性的事故,并给出全堆熔化事故下的放射性源项,对CUP600应急计划区范围进行初步的分析计算。结果表明:CUP600向环境释放源项较小,整个事故期间在预计厂址边界处的有效剂量和甲状腺剂量均不超过相应的干预水平;CUP600的烟羽应急计划区可以划至厂址边界,从而取消场外烟羽应急计划区。An envelope accident was selected and corresponding source term was given. Then this paper made a calculation about the size of emergency planning zone. Calculation results show that the radioactive release of CUP600 to the environment is small, the effective dose and thyroid dose during the whole accident are both less than the general optimized intervention level. The plum emergency zone can be totally inside the site boundary, so technically, out site plum emergency planning zone can be eliminated.

关 键 词:CUP600 应急计划区 厂址边界 

分 类 号:TL329[核科学技术—核技术及应用]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象