检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水利水电第十工程局有限公司,四川都江堰611830
出 处:《四川水力发电》2016年第5期51-53,70,共4页Sichuan Hydropower
摘 要:水库库容是水库发电、防洪调度中的一个非常重要的技术参数,库容的变化直接影响调洪时水量的平衡及发电量的多少。为及时了解水库因泥沙淤积等原因引起的库容变化,需经常进行库容的复核测量。结合柬埔寨甘再水电站库容复测工程实例,介绍了一个库容测量新方法,供同行参考与借鉴。Reservoir storage is the very important techenical parameter of reservoir regulation for power generation and flood control. Reservoir storage variations directly influence water balance and amount of power generation during flood regulation. In order to duly understand reservoir storage variations caused by sedimentation,check measurements for reservoir storage need to be performed frequently. In this paper,according to actual check measurements for reservoir storage at Kanchay hydropower station in Cambodia,a reservoir storage measurement method is presented to provide references and experineces for similar projects.
分 类 号:TV697.2[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147