检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东科技大学土木工程与建筑学院,山东青岛266590 [2]山东科技大学矿业与安全工程学院,山东青岛266590
出 处:《煤炭技术》2016年第11期153-155,共3页Coal Technology
基 金:国家自然科学基金资助项目(51379119);山东科技大学矿山灾害预防控制省部共建国家重点实验室培育基地开放课题基金项目(MDPC2013ZR03);山东科技大学人才引进科研启动基金项目(2014RCJJ027)
摘 要:龙固煤矿中央泵房埋深-855 m,围岩变形大、支护风险高。为解决中央泵房硐室围岩的支护难题,基于先"柔"后"刚"的模式提出了锚网索喷让压+锚注联合支护方案,并分别通过理论分析和数值模拟对泵房围岩注浆效果进行了研究,取得了较好的围岩加固效果。The Longgu mine central pump room is -855m in buried depth, which faces with the problem of large deformation of surrounding rock and supporting difficulty. In order to solve the difficulty problem of surrounding rock control in the central pump room, the combined support scheme of bolt-mesh-anchor - pressure relief + bolt-grout have been put forward based on the model of "flexible" and "rigid", and studied respectively by theoretical analysis and numerical simulation of wall rock grouting effect,which obtain good effect of surrounding rock reinforcement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.223.238.221