检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:徐左屏 Xu Zuo-ping
出 处:《建筑技术开发》2016年第9期36-36,42,共2页Building Technology Development
摘 要:上海金光商务区B1-9地块项目地下结构采用无缝自补偿抗裂施工技术,通过混凝土高效ZY外加剂、温度后浇带、应力加强带、温度数字监测、喷淋养护和保温加热措施,借助Cu50铜热电阻温度传感器动态控制内外温差,确保地下室结构混凝土中部温度一般在24~96h达到峰值,内表最大温差为22℃,有效解决了超长无缝地下结构混凝土温度裂缝预防和控制问题。Underground structure of Shanghai Golden commercial district B1-9 to block the project adopts seamless self compensation construction technology crack through efficient ZY concrete admixture,temperature after pouring belt,stress strengthening belt,temperature monitoring digital,sprinkling maintenance insulation and heating measures,Cu50 copper heat resistance temperature sensor dynamic by controlling the temperature difference inside and outside,to ensure that the basement concrete structure temperature in the middle of the general in the 24~96h peak,in the form of maximum temperature of 22 degrees C,effectively solve the overlong jointless underground concrete structure temperature crack prevention and control problems.
关 键 词:超长结构 无缝施工 温度监测 喷淋养护 裂缝控制
分 类 号:TU755.7[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145