检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王金东[1] 韦勇[2] WANG Jindong WEI Yong(Luoyun Hydraulic Project Management Division of Jiangsu Province, Suqian 223800, Jiangsu Hongze Lake Hydraulic Project Management Division of Jiangsu Province, Huaian 223100, Jiangsu)
机构地区:[1]江苏省骆运水利工程管理处,江苏宿迁223800 [2]江苏省洪泽湖水利工程管理处,江苏洪泽223100
出 处:《江苏水利》2016年第7期39-41,共3页Jiangsu Water Resources
摘 要:《行政强制法》出台以后,省属水利工程管理机构处于只有地方性法规对行政处罚权的授权,而无行政强制措施权的授权状态。本文以行政执法程序中常用的责令相对人停止违法行为为例,分析可能造成的行政处罚权和行政强制措施的冲突,并针对这一冲突,提出解决方法。After the introduction of the“Administrative Enforcement Compulsory Law”,the provincial water conservancy project management organizations are in the state of under administrative punishment right of authorization by local regulations,but no compulsory administrative measures right of authorization. In this paper,taking the order of administrative individual stop illegal act in the commonly administrative law enforcement procedures as an example,conflict of administrative punishment right and the administrative compulsory measures is analyzed. Solution for the conflict is proposed.
分 类 号:TV51[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28