检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津大学电气与自动化工程学院,天津300072
出 处:《电力系统及其自动化学报》2016年第10期55-60,共6页Proceedings of the CSU-EPSA
基 金:天津市自然科学基金重点资助项目(12JCZDJC21300)
摘 要:由于光伏发电系统的非线性特性,难以运用数学手段确定其最大功率跟踪MPPT(maximum power pointtracking)过程输出功率的合理采样周期。针对基于Boost电路光伏发电系统进行MPPT过程,对工作点输出功率最佳采样周期进行仿真和采样,分析了全过程采样周期的分布规律。分析表明,不同环境条件下,最佳采样周期最大值近似为恒定值,因而选取该恒定值作为适合于MPPT全过程的采样周期,保证了MPPT算法的跟踪速度和跟踪精度。Due to the nonlinearity of photovoltaic power generation system,it is difficult to determine a proper sampling period at each operating point in the maximum power point tracking(MPPT)mathematically. Based on the simulation and sampling of the optimal sampling period during MPPT for the Boost-based photovoltaic power generation system,this paper analyses the distribution pattern of the sampling period. It is indicated that since the maximum of optimal sampling period approximates to a constant value under different environmental conditions,this value is selected as the proper sampling period for the whole process of MPPT,which ensures the tracking speed and precision of MPPT.
关 键 词:采样周期 最大功率跟踪 BOOST变换器 光伏发电系统 非线性
分 类 号:TM615[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.251.50