中国移动光传送网十一期传输线路工程对长白山自然保护区环境影响的分析  

The analysis of the effect of China mobile optical transmission network 11 issue line engineering on Changbai mountain nature reserve environment

在线阅读下载全文

作  者:李杨[1] 杨延军 孙宏刚[1] 孟得干 

机构地区:[1]吉林省林业勘察设计研究院,吉林长春130022 [2]靖宇县林业局,吉林白山135200

出  处:《吉林林业科技》2016年第6期48-51,共4页Journal of Jilin Forestry Science and Technology

摘  要:本文介绍了中国移动光传送网十一期传输线路工程穿越长白山自然保护区段的工程概况,根据工程特点阐述了由于工程建设对周围环境特别是对长白山自然保护区造成的影响,分别从大气环境、声环境、水环境、固体废弃物、生态影响等五个方面进行分析,并且从施工期和运营期两个时期进行详细阐述,最后提出可行保护措施和建议。The project profile of China mobile optical transmission network 11 issue line engineering which passed through changbaishan nature reserve was introduced. The effect of engineering construction on surrounding especially changbaishan nature reserve was elaborated according to project characteristic. It was analyzed from atmospheric environment,acoustic environment,water environment,solid waste,ecological effect. Furthermore,it was elaborated from construction and operation period in detail. Eventually,the feasible protection measures and suggestions were raised.

关 键 词:传输线路 噪声 生态影响 

分 类 号:X820.3[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象