检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:娄现勇 高建恩[1,2] 韩赛奇 郭子豪[2] 尹燕[1]
机构地区:[1]西北农林科技大学水土保持研究所,陕西杨凌712100 [2]中国科学院教育部水土保持与生态环境研究中心,陕西杨凌712100
出 处:《水电能源科学》2016年第10期23-27,共5页Water Resources and Power
基 金:陕西省科技统筹创新工程项目(2013KTD03-03-01);国家自然科学基金项目(41371276);国家"十二五"科技支撑计划(2011BAD31B05);中国科学院水利部水土保持研究所知识创新工程专项(水土保持工程;A315021304)
摘 要:针对黄土高原丘陵沟壑区沟道整治工程造成的下垫面的剧烈变化,通过野外调查、室内试验模拟的方法,研究了流域沟道不同整治比例(0%、20%、30%、40%、50%)、不同降雨强度(40、60、80、100、120mm/h)情况下,沟道地表径流流速变化、流域控制工程坝前蓄水变化及对沟道洪水标准的影响。结果表明,随着沟道整治比例的增大,相对于沟道无整治工程时地表径流平均流速分别减小6.21%、10.95%、19.85%、21.78%,流域控制工程坝前平均蓄水分别减小3.94%、15.55%、17.23%、23.90%,径流系数由无整治工程时的0.80减小至0.61。随着降雨强度的增大,平均流速由0.102m/s增大至0.160m/s,流域控制工程坝前平均蓄水与40mm/h时相比分别增加5.90%、24.17%、30.80%、38.82%,径流系数由0.59扩大至0.81。由此可见,流域沟道不同整治比例和不同降雨强度对流域控制工程的径流蓄积、径流系数及洪水设计均具有较大影响,实际工程设计中应考虑其影响,不可忽略。Land consolidation engineering of gully channel in the loess hilly and gully region has brought dramatic changes of land surface.The impact of different land consolidation proportions and rainfall intensities on channel surface runoff velocity,the impoundment volume in front of dams and the flood standard of gully channel were studied by field investigations and lab simulations.The results show that with the increasing of land consolidation proportion,the average velocity of surface runoff decreased by 6.21%,10.95%,19.85% and 21.78%,respectively.The average impoundment volume in front of dams decreased by 3.94%,15.55%,17.23% and 23.90%,respectively,and the runoff coefficient decreased from 0.80 to 0.61.With the increasing of the rainfall intensity,the average velocity increased from 0.102m/s to 0.160m/s.Compared to the lowest rainfall intensity,the average impoundment volume in front of dams increased by5.90%,24.17%,30.80% and 38.82%,respectively,and the runoff coefficient increased from 0.59 to 0.81.Therefore,different consolidation proportions and different rainfall intensities have a great impact on runoff accumulation,runoff coefficient and designed flood standard and that should not be neglected in the real projects.
分 类 号:TV41[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222