检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘愚
机构地区:[1]江西省水利水电建设有限公司,江西南昌330000
出 处:《水利建设与管理》2016年第8期24-28,共5页Water Conservancy Construction and Management
摘 要:邵伯闸是南水北调东线工程输水线路上的涵闸,已严重老化。为防止在加固改造过程中出现地基液化的情况,采用局部灌浆的方法对其进行加固。本文针对邵伯闸地基土在局部灌浆前后的液化特性进行振动三轴试验,并进行数理分析,研究表明局部灌浆可以有效防止节制闸地基土的液化,为其他节制闸改造加固工程提供借鉴。Shaobo Sluice is a sluice gate on water conveyance line of South-to-North Water Diversion East Line Project, which has been aged seriously. Local grouting method is adopted for consolidation in order to prevent foundation liquefaction possibility during the reinforcement process. In the paper, vibration triaxial experiment is carried out aiming at the liquefaction characteristics of Shaobo Sluice foundation soil before and after local grouting. Foundation soil liquefaction problem is studied mathematically, thereby providing reference for other regulating sluice transformation and reinforcement projects.
分 类 号:TV223[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248