新型壁挂式煤仓设计及施工技术  被引量:5

Design and construction technology of a new wall-mounted bunker

在线阅读下载全文

作  者:王兴开 霍小泉 谢文兵[1] 臧龙[1] 张乾龙[1] 

机构地区:[1]中国矿业大学煤炭资源与安全开采国家重点实验室,江苏徐州221116 [2]陕西陕煤铜川矿业有限公司下石节煤矿,陕西铜川727000

出  处:《煤炭工程》2016年第11期15-17,共3页Coal Engineering

基  金:煤炭资源与安全开采国家重点实验室自主研究课题基金资助项目(SKLCRSM08X01)

摘  要:为解决下石节煤矿214煤仓装载硐室底板遇水强烈膨胀而多次失稳破坏的难题,设计了新型壁挂式煤仓。该煤仓采用工字钢托梁、工字钢仓体托架及其固定锚索、自锁承重锚索等构建煤仓自承载系统,利用煤仓围岩承担煤仓的全部重量,去掉了煤仓下口给煤硐室承载结构。同时,采用了电渣压力焊、高强抗冲击耐磨材料等先进工艺和新材料,提高了壁挂式煤仓整体工艺水平,缩短了煤仓的建设时间,减少了给煤硐室的建设与维护费用。现场实践表明,新型煤仓稳定可靠,技术经济效益良好,在类似的地质条件下具有很好的推广应用价值。Aiming at the intense expansion of coal feeding chamber floor for 214 coal bunker affected by water in Xiashijie Coal Mine, the wall-mounted bunker was designed. The self-bearing system of wall-mounted bunker that was composed by I-beam joists, steel joist bracket of bunker body with fixed anchors and self-locking bearing anchors, bearing the full weight of coal bunker on the surrounding rock and dislodging the beating structure at the bottom of coal feeding chamber. While using electroslag pressure welding, high-strength impact resistant materials and other advanced technology and new materials, the overall process of bunker wall-mounted was improved, the construction time of bunker was shorten, and the cost of construction and maintenance for coal feeding chamber also was reduced. Field test proved the reliability, obviously technical and economical benefits.

关 键 词:给煤硐室 底鼓 壁挂式煤仓 自承载系统 

分 类 号:TD264[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象