ANNUAL RENOVATION OF THE POTALA PALACE STARTED IN LHASA  

ANNUAL RENOVATION OF THE POTALA PALACE STARTED IN LHASA

在线阅读下载全文

作  者:Ling Lan Phurbu Tashi 

出  处:《China's Tibet》2016年第6期F0002-F0002,共1页中国西藏(英文版)

摘  要:The annual renovation on the walls of the Potala Palace has begun on Oct.28th and would last around 20 days.Since the rainy season in Lhasa has passed,the painting will help remove the water marks left in summer and provide protection for the palace walls.The annual renovation on the walls of the Potala Palace has begun on Oct.28th and would last around 20 days.Since the rainy season in Lhasa has passed,the painting will help remove the water marks left in summer and provide protection for the palace walls.

关 键 词:布达拉宫 拉萨 整治 墙壁 城墙 

分 类 号:TU-87[艺术—艺术设计]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象