检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]日立永济电气设备(西安)有限公司技术中心,陕西西安710018
出 处:《电子科学技术》2016年第6期726-730,共5页Electronic Science & Technology
摘 要:针对地铁车辆列车网络控制系统(TCMS)的构成及编组拓扑,本文给出了TCMS系统设计和开发的详细流程,介绍了系统开发环境搭建、ISaGRAF Target移植、ISa GRAF图形封装,并以TCMS与辅助控制单元(APU)二者之间建立通信为例进行说明。通过TCMS系统与APU设备进行联调试验,达到了通信的良好性能,验证了TCMS系统与APU通信设计开发的准确性、可操作性和稳定性。For the train constitution and Marshalling topology in the Metro Train Control and Manager System (TCMS), The paper proposed a detailed system design and development process, introduced the system development environment, ISaGRAF Target transplantation, ISaGRAF graphics package, and how to establish communication between TCMS and Auxiliary Power Unit (APU).Through the combined regutation test, it achieved good performance of the communication, and verified the accuracy, maneuverability and stability of TCMS system development process.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171