缅甸密松其培电源电站混凝土施工探讨  

Discussion of concrete construction of the power plant for Myanmar Myitsone and Chibwe hydropower station construction in Burma

在线阅读下载全文

作  者:王光烽 

机构地区:[1]国家电投云南国际电力投资有限公司,昆明650228

出  处:《水科学与工程技术》2016年第5期75-77,共3页Water Sciences and Engineering Technology

摘  要:缅甸密松其培电源电站为混凝土重力坝,大坝混凝土施工难度较大。根据电站的特点,对施工程序和强度进行分析,优化混凝土浇筑施工工艺和方法,加强施工质量保证,提高温度控制标准和质量,取得了良好的工程和经济效益。The power plant for Myanmar Myitsone and Chibwe hydropower station construction is a concrete gravity dam, the construction is full of difficulty. According to the characteristics of the power plant, the construction program and strength are analyzed. Through the optimization of concrete pouring construction technology and methods, the assurance of construction quality is strengthen, the standard and quality of temperature control is improved, and then obtained the good benefits of engineering and economy.

关 键 词:大坝 混凝土 浇筑 施工 质量控制 

分 类 号:TV544[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象