检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖北工业大学土木建筑与环境学院,湖北武汉430068
出 处:《湖北工业大学学报》2016年第5期84-87,共4页Journal of Hubei University of Technology
基 金:国家自然科学基金(51408202)
摘 要:针对杨泗港大桥工程量大、时间紧迫、技术难点多的特点,运用BIM技术,依托Catia软件建立杨泗港大桥汉阳侧锚碇三维可视化模型并进行相关分析。结合工程图纸和BIM模型进行锚碇混凝土与混凝土、钢筋与混凝土的碰撞检查,减少了因施工图纸的错误造成的不必要的返工。并进行了锚碇混凝土、钢筋工程量统计与传统二维设计的比对,为业主提出了一个合理的物料工程清单表。Due to large projects,time constraints and many technology difficulties in Yangsigang Bridge anchor construction,the study used the BIM technology,relying on Catia software to build Yangsigang Bridge anchor 3Dvisualization model.It then combined engineering drawings with BIM model to conduct collision check for anchor concrete and concrete,steel and concrete,which reduced the unnecessary rework due to the fault of construction drawings.The engineering quantity of concrete and steel bar was also compared with the traditional 2Ddesign.It finally proposed a reasonable BOM table for the owners.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.43