摘 要:根据工程水文、地质情况,对黄河大跨越段基础设计原则、方案比选、具体基础选型及优化进行研究,特别对大跨越基础优化措施进行了详细对比分析。结果表明,参照实测各层土的侧阻、端阻力可以适当减小桩长;建议塔位地基土的物理力学指标应参照相应塔位的试验结果;根据本工程试桩情况,宜采用PPG后注浆方式减小桩底沉降。According to the engineering hydrology and geological conditions, the design principle, scheme selection, type selection and optimization of the tower foundation for the long-span Crossing the Yellow River are studied, especially the detailed comparative analysis is done to the large span foundation optimization measures. Results show that the length of pile could be appropriately reduced refer to the side resistance and end resistance of each measured soil layer, the soil physical and mechanical indexes should be according to test results. Based on the test, a post-grouted PPG pile is recommended to reduce the pile settlement.
分 类 号:TM754[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28