检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]交通运输部长江口航道管理局,上海200003
出 处:《水运工程》2016年第11期151-156,共6页Port & Waterway Engineering
摘 要:近年来,因长江口上游径流、外海潮汐和河口海洋环境的剧烈变化以及长江口水域河口及海岸工程的大量兴建,特别是规模宏大的长江口深水航道治理工程的建设,可能会导致河口潮汐产生变化。对长江口深水航道工程建设前后长时间序列的11个潮位站潮位资料进行分析,得出长江口近期潮汐特性的变化特征:口外潮汐特性主要受外海潮汐总体变化影响,口内潮汐特性受北槽深水航道治理工程及周边涉水工程建设的影响。In recent years, because of the dramatic changes in the upstream runoff of the Yangtze estuary, seatide and estuarine marine environment, and more engineering constructions in the Yangtze River estuaries and alongthe coast, specially the constructions of the Yangtze estuary deepwater channel regulation project may cause somechanges in the tidal estuary. Based on the analysis of the Yangtze estuary deepwater channel project constructionbefore and after the long-time series of 11 tidal station data, we get to know the tide variation characteristics ofYangtze estuary in recent period and realize that the tidal characteristics out of the estuary is mainly affected by theouter tidal changes, and that in the mouth is mainly affected by the deepwater channel regulation project andsurrounding engineering construction.
分 类 号:U617[交通运输工程—船舶及航道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229