吹填陆域锚桩施工技术  

Anchor sheet pile construction technology at hydraulic reclamation area

在线阅读下载全文

作  者:王超[1] 于洋[1] 段昶[1] 

机构地区:[1]中交第二航务工程局有限公司,湖北武汉430012

出  处:《水运工程》2016年第11期199-202,共4页Port & Waterway Engineering

摘  要:以色列阿什杜德港出运码头采用钢板桩结构。锚桩施工区域为吹填陆域,现场受吹填交叉作业影响,施工设备存在较大安全隐患;受锚桩两侧土压力不均及砂体液化影响,复沉过程中发生偏位现象。通过有效控制吹填管头、围坝囤沙、适当增大填砂范围及预留锚桩偏位等技术措施,有效解决了相关安全问题及技术难题,保证了锚桩施工进度。The steel sheet pile structure was adopted in Israel Ashdod port staging harbor. Since the anchorsheet pile construction was at the hydraulic reclamation area, the construction facilities faced a safety risk due to theununiform soil pressure on both sides of the sheet pile and sand liquefaction, deviation occurred during restrickingconstruction.Taking measures including controling the head of reclamation pipe, storing sand with temporary dam,and increasing reclamation area and reserving sheet pile deviation, etc., we solved related problems concerningsafety and technology, and ensured the construction schedule of the anchor sheet pile.

关 键 词:吹填陆域 锚桩偏位 施工技术 

分 类 号:U655.54[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象