作 者:丁正全[1]
出 处:《施工技术》2016年第22期49-51,共3页Construction Technology
基 金:国家科技支撑计划资助项目(2013BAB10B05)
摘 要:简要介绍了TBM工法在煤矿矿山建设领域的优势及传统施工方法的缺点;分别以煤矿平硐和斜井工程为例,详细介绍并分析了盾构机和TBM两类产品的设计参数、应用难点及施工效果,并对其在矿井开拓工程领域的发展趋势进行了展望。The advantages of TBM method and disadvantages of conventional construction method in the exploiting field of coal mine were introduced briefly. Adit tunnel and inclined shaft were exampled separately, this paper introduced and analyzed the design parameters, difficulty in application and working effect on the both shield machine and double model TBM, and the developing future of these machines in coal mine also was expected eventually.