检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]水利部大坝安全管理中心,江苏南京210029 [2]国家知识产权局专利复审委员会,北京100080
出 处:《水利建设与管理》2016年第9期12-16,32,共6页Water Conservancy Construction and Management
摘 要:本文分类统计了中国现有已建和在建坝高100m以上水库和库容10亿m3以上水库,系统分析高坝大库的建设年代、地域分布、主要任务、库容与装机、坝型等特征,从定量指标上反映高坝大库在经济社会发展中的重要地位,以及中国水库建设从低坝小库向高坝大库、从单一筑坝材料向多种材料复合应用的发展变化趋势。In the paper,reservoirs which have been constructed and under construction with the dam height of more than100 meters in China and reservoirs with the capacity of more than 1 billion cubic meters are classified and counted.Construction year,regional distribution, main tasks, reservoir capacity and installed capacity, dam type and other characteristics are systematically analyzed. The important position of high dam large reservoirs in economic and social development is reflected from quantitative indicator. The development and change trend of Chinese reservoir construction from low dam small reservoir to high dam large reservoir as well as from single dam construction materials to multi-materials complex application is discussed.
分 类 号:TV632[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117