水泥土搅拌桩施工方法探讨  被引量:2

Discussion on soil-cement mixing pile construction method

在线阅读下载全文

作  者:梁伟 乔爱英 林彬彬 

机构地区:[1]山东东平湖管理局东平管理局,山东泰安271500 [2]福建省江海工程管理有限公司,福建泉州362000

出  处:《水利建设与管理》2016年第10期9-12,共4页Water Conservancy Construction and Management

摘  要:水泥土搅拌桩施工方法分干法(粉体搅拌法)和湿法(浆液搅拌法),按照规范规定"当地基土的天然含水量小于30%、大于70%时不应采用干法",马山头排水涵洞重建工程施工方法为湿法施工。本文主要探讨水泥土搅拌桩在无法严格执行规范施工的情况下,改进施工工艺及施工顺序,将规范规定的"三搅二喷"或"四搅一喷"工艺变为"四搅四喷",有效将水泥浆液均匀、足量喷入土体中,保证水泥土搅拌桩施工质量。Soil-cement mixing pile construction methods are divided into dry method( powder mixing method) and wet method( slurry mixing method). It is regulated in the specification that ‘dry method should not be adopted when the natural water content of foundation soil is less than 30% and more than 70%). Wet method is adopted as construction method in Mashantou Discharge Culvert Rebuild Project. In the paper,the improvement of construction process and construction sequence is mainly discussed under the condition that specified construction cannot be implemented strictly.‘Three-mixing and two-injection'or‘four-mixing and one-injection'process regulated in the specification is changed into‘four-mixing and four-injection',so that the cement slurry is efficiently injected into soil evenly and sufficiently to ensure the construction quality of cement-soil mixing pile.

关 键 词:地质概况及技术要求 试验桩施工 设备及施工方案选择 参数确定 质量控制 

分 类 号:TV223[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象