管线沟槽回填土密实度与自然沉降时间关系试验探究与总结  被引量:5

Relationship experimental exploration and summary of pipeline trench backfill soil compactness and natural settling time

在线阅读下载全文

作  者:冯辰晨 刘瀚泽 

机构地区:[1]辽宁华宁招标代理有限公司,辽宁沈阳110003 [2]辽宁省水利工程技术审核与造价管理中心,辽宁沈阳110003

出  处:《水利建设与管理》2016年第10期35-39,共5页Water Conservancy Construction and Management

摘  要:通过对大伙房输水工程建安标预留试验段已完成回填的沟槽土取样检测,分析不同时期回填土密实度变化情况,总结回填土密实度与自然沉降时间关系及不同类型回填土沉降后密实度变化情况,为管道沟槽回填施工的控制和检测评定提供参考和借鉴。Trench soil backfilled in Dahuofang Water Conveyance Project Jian'an bid reserved test section is sampled and tested. Change conditions of backfilled soil compactness during different periods are analyzed. The relationship between backfilled soil compactness and natural settling time as well as compactness change condition after the settling of different type backfill soil are summarized,thereby providing reference for pipeline trench backfill construction control and testing evaluation.

关 键 词:回填料 自然沉降 压实度 

分 类 号:TV672.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象