合同制目标管理与动态化过程管理的结合(下)——以国家科技攻关305项目管理模式为例  被引量:1

Integration of Contract Objective Management with Active Process Management -- - With management mode of National Project305as an example

在线阅读下载全文

作  者:马映军[1] 曹阳[2] 刘波[2] 

机构地区:[1]国家305项目办公室,新疆乌鲁木齐830000 [2]成都理工大学,四川成都610059

出  处:《国土资源科技管理》2002年第4期69-72,共4页Scientific and Technological Management of Land and Resources

摘  要:Adopting the advanced management methods,the national project305has had its systematic and characteristic man-agement mode,which is marked by a dominant and efficient management mode integrating contract objective management with dynamic process management.A dynamic management mode with the combination of rolling plan management,full-scale quality control and economic lever,it has been promoting the industrialization of scientific achievements and is worthy to be spread.Adopting the advanced management methods,the national project305has had its systematic and characteristic man-agement mode,which is marked by a dominant and efficient management mode integrating contract objective management with dynamic process management.A dynamic management mode with the combination of rolling plan management,full-scale quality control and economic lever,it has been promoting the industrialization of scientific achievements and is worthy to be spread.

关 键 词:动态化过程管理 项目管理模式 计划 组织 指挥 协调 控制 合同制目标管理 

分 类 号:TU723[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象