某大型水利枢纽汛期分期方案研究  被引量:1

Study on a Hydraulic Project Flood Season Staging Program

在线阅读下载全文

作  者:赵璧奎[1] 黄本胜[1] 邱静[1] 谭超[1] 罗舒燕 

机构地区:[1]广东省水利水电科学研究院,广东省水动力学应用研究重点实验室,河口水利技术国家地方联合工程实验室,广东广州510635

出  处:《广东水利水电》2016年第9期6-10,28,共6页Guangdong Water Resources and Hydropower

基  金:广东省水利科技创新项目(2012-02、2011-06、2014-06)

摘  要:汛期分期方案研究是开展水库汛期水位动态控制技术研究的重要基础。综合采用成因分析方法和数理统计方法,分析了某大型水利枢纽库区暴雨、洪水发生规律,提出了把汛期划分为前汛期、主汛期和后汛期3个阶段的汛期分期方案。研究成果可为该水利枢纽及同一流域内相关水利工程开展雨洪资源化利用研究提供基本依据。The study of flood stage constitutes an important basis for the research of reservoir water level dynamic control in flood season. By using of both cause analysis method and mathematical statistics, an analysis to the occurrence law of rainstorms and floods in reservoir area of a large hydro project has been made, and a flood staging method of dividing flood season into such three stages as pre - flood season, major flood season and post - flood season has been proposed. The research results can provide a fundamental basis on utilization of rainwater resources for both the hydro project and related project in the same river basin.

关 键 词:大型水利枢纽 汛期分期 成因分析 数理统计 

分 类 号:TV213.9[水利工程—水文学及水资源] TV697.1

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象